Upper Milford Township Wastewater System Evaluation & Improvements
IMPORTANT NOTICE: – Smoke testing is scheduled for Saturday, September 14.
View the impacted customers on our interactive map.
Smoke Testing – September 14, 2024
LCA will perform “smoke testing” on September 14, 2024, in the development of David Dr. and
S. 7th Street between 8 am and 3 pm.
Non-toxic and harmless smoke will be pumped into the sewer lines and visual inspections will be completed. This helps us identify leaks and issues in the system that need repairs.
Smoke will appear anywhere there is a leak in the system as it rises through the soil and is visible above the surface.
Smoke may also appear where there is a connection to the system that should not be there, such as roof leaders, sump pump pits, or floor drains. Smoke will be white and will dissipate within 10‐15 minutes. The smoke has a mild odor but will not smell like burning materials.
Make a note of any locations where you see smoke if it is visible inside the home.